Duct heater and fan interlocks: air first, heat second

A duct heater dumps its heat into air. Stop the air and you have dry firing. The interlock has one job: no proven airflow, no power to the elements.

  • Airflow switch as permissive
  • Loss of air cuts heat
  • Fan runs on after a trip
  • No standalone heat start button

Duct heaterPublished 2026-10-08中文版 ↗

01Four interlock rules

Start permissive

A differential pressure switch across the section, or the drive running feedback, must be closed before the heat contactor can pick up.

Stop cuts heat

Fan stop or airflow decay opens the heat circuit at once while the fan keeps running to carry residual heat out of the shell.

High limit

Outlet temperature probe trips heat only, never the fan. Keep the alarm 5~10 °C away from the process setpoint.

Group switching

Banks stage in on temperature deviation, reducing inrush and avoiding a high surface load at low duty.

02Cross-checking airflow against temperature rise

For atmospheric air use P(kW) ≈ 0.335 × airflow (m³/h) × rise (°C) ÷ 1000, which already assumes 1.2 kg/m³ density and 1.005 kJ/(kg·°C) specific heat. 5000 m³/h with a 60 °C rise needs about 100 kW; add 10%~20% margin and specify 110~120 kW.

Then work backwards to watt density: spread that duty over the heated surface area and compare with the 3~5 W/cm² range for forced air. Outside the range means the envelope is too small — lengthen the heated section or add elements rather than raising power per tube. Verify both numbers once with measured current and outlet temperature.

03Common wiring problems

Separate heat and fan buttons

An operator can energise heat before air. Heat should have a permissive, never a start of its own.

Probe on the inlet side

It reads cold air, so the controller keeps driving output while the real outlet runs far above setpoint.

Relying on controller limiting

A controller stuck at full output has no backstop; an independent over-temperature trip is required.

Unrepaired duct leaks

Leaked air takes no part in heat exchange, so measured airflow and temperature rise no longer agree and the heater looks underpowered.

04One calculation before wiring

Commissioning order: clamp-meter the three phases and compare with nameplate current (clearly low means a bank is not switching in); record the delay between fan start and heat permissive (it must be greater than zero); then back-calculate the actual temperature rise from airflow and outlet temperature against setpoint. When all three agree, the interlock and the duty are both proven.

↗Related guide

Related guide: SCR vs. Contactor Control for Electric Heaters: How to Choose

Send the numbers and we will run them through this method

Medium, flow, temperatures, pressure. With those four, duty and architecture are a same-day answer.

Submit your duty →

FAQ

Common questions

01Can a timer replace the airflow switch?+

No. A timer cannot prove airflow; with a blocked duct or slipping belt the elements still energise — that is dry firing.

02Should the fan run on after a trip?+

The fan should, the heaters must not. The direction is air on first, heat cut fast, fan delayed to clear stored heat.

03Is drive running feedback enough?+

It helps, but a differential pressure switch across the section is stronger evidence because it proves air movement, not motor status.

INQUIRY PREP

Come prepared, decide faster on Tubular Elements

Have these parameters ready — they feed directly into model selection, power sizing and mechanical design review.
Send your spec ↗
K13Electric heaters for paint curing and powder coating ovensHow to size an electric heater for a paint curing or powder coating oven: the four real loads, a worked tunnel example, element layout in recirculating air, and the three commissioning failures that get blamed on the heater.K20Electric reheat for cleanroom and pharmaceutical AHUsElectric reheat in cleanroom and pharmaceutical air handling: duty from airflow and ΔT, hygienic element construction, face velocity limits, SCR versus stepped control, and the interlocks and documentation a validated plant expects.K7What watt density should an electric heater tube use?How to calculate watt density, the working ranges for water, oil, still air and forced air, and the four mistakes that burn tubes: total power only, heated length, scaling and supply voltage.K8How to support a pipeline heater and allow for expansion?Bracket layout for pipeline heaters, expansion growth by material, why both-ends-fixed joints leak, and the cold-plus-hot commissioning checks.K9What protection settings does an electric thermal oil heater need?The four guards on electric thermal oil heaters — outlet high limit, low level, loss of circulation and sheath over-temperature — their action order, why film temperature governs, and typical missettings.K11How to pick the temperature class for an Ex heater?T1 to T6 surface limits, why peak temperature includes fault conditions, the margin needed for control swing and probe placement, and four installation checks on flame paths and glands.K12Why is my heater underperforming when the calculation was fine?Four causes behind low output: supply voltage, insulation loss, flow off the design point and fouling or a dead bank — plus the U² power relation and a four-step site test.K1Why thermal oil heaters coke up — and how to prevent itCoking is not an oil problem. It is what happens when surface heat flux, flow velocity and film temperature get out of balance — here is how to keep them in line.K2Duct heater power calculation — formula and worked examplesThe standard heat duty formula, airflow unit conversions, how much margin to add — then two real projects calculated end to end.K3Hazardous-area electric heaters: Group IIB/IIC and temperature class explainedHigher Ex rating is not automatically safer — it is about matching. Zone, gas group and temperature class, one layer at a time.K4Five installation mistakes that ruin pipeline heatersThe heater was fine; the installation set the trap. Reverse flow, misplaced sensors, no minimum-flow interlock, pipe stress on flanges, missing vents — check your site against this list.K6Electric heating duty calculation: from specific heat to a real specificationThis guide covers the heat-duty formula, common property values, additional loads and the process data needed for a preliminary quotation.